Ask for the last inspection record, the equipment or zone covered and any outstanding corrective work. Note visible damage or leakage and its location. Leave testing of valves, pumps and pipework to the responsible specialist.
Which maintenance entries need follow-up?
Match the equipment identifier in the maintenance record to the area it serves. If a service entry identifies a deficiency, request the corrective work record and the follow-up result. A dated attendance sheet alone leaves that question open.
For the standard’s scope and publication details, see NFPA 25. Confirm the applicable requirements for the project with its responsible specialist.
Discuss an inspection with UrbanGrid