Abu Dhabi · Completing a fit-out
Post-fit-out inspection in Abu Dhabi
Before you close out a renovation or fit-out, have the finished work checked against the items you asked the contractor to deliver.
Arranging your inspection in Abu Dhabi
Share approved drawings, work schedule and completion confirmation for accessible tenant fixtures.
Inspection scope
- Check visible joints, edges and alignment in the finished areas.
- Try accessible doors, drawers and installed fittings included in the visit.
- Match incomplete items to the relevant room and work schedule.
What the report records
You receive a list you can walk through with the contractor. A photograph and room reference identify each item, whether it is a cabinet door catching on its neighbour or an unfinished junction.
Can the inspector check pipework behind a finished wall?
The inspector can check an accessible outlet if water is available and the check is included. The condition of concealed pipework would need a separately agreed investigation.